Apartment block in Zug, Switzerland
In the 3 months from stopping construction to construction acceptance
At an apartment block in Zug, construction came to a halt, caused by the constructors’ legal representative. After bauhelp! was brought on board, within 3 months the dwelling was brought up to standard and received acceptance without substantial defect. bauhelp! reacted immediately and in cooperation with all those involved, the contractor at issue was disciplined and, wherever necessary, remedial measures were put in place, so that a permanently defect-free building could arise.
